Wednesday, October 16, 2019
15 Minutes of Stitching - Week 41 2019
Let us see how the last week went on the stitching front.
Days spent stitching in the week: 7 out of 7
Days spent stitching in October: 13 out of 13
Days spent stitching in 2019: 274 out of 286
Success Rate: 95.8%
My week runs from Monday to Sunday.
This week went well in finding time to stitch. So far, I'm doing well to find time during the last quarter, as this is a small goal I set for myself. I have a project that is going together really easily, and each night I make great progress. This helps me find the motivation to keep stitching to keep making progress. Who does not love checking things off a list?
This week, no fabric went out as I am putting together blocks with no sashing or extra fabric. That is okay, as the next few weeks very little will go out as I work on the back. We went out of town for a day trip to the mountains for some apple picking last week, and I found a small quilt shop. When we stop by small quilt shops I always love to pick up a few things to support them, so I got a little there. My goal for the end of the year is to only gained 325-350 yards. I need to get cracking on finishing some quilts so I can meet this goal!
Fabric out this week: 0 yards
Fabric out, in 2019: 45.23 yards
Fabric in this week: 4.03 yards
Fabric in, in 2019: 412.44 yards
Fabric difference in 2019: gain of 367.21 yards
I hope everyone had a great week!
Sharing at:
Life in Pieces
-Christina
Tuesday, October 15, 2019
Design Wall Tuesday
Where did the last two weeks go? Oppps, I lost track of time. But I have gotten a lot done! I started out with this....
And ended the weekend with this!
Wow, the bottom half of the back is almost all layed out. There are two more rows, which I hope to get laid out by the end of this weekend. Whoops, I'm getting a little ahead of myself. I was able to get seven rows sewn together, plus the middle is completely pieced, and the new few rows are all sewn together, waiting to come together with the next section to become bigger. (I just found a mistake in row 25, I hope to fix it tomorrow)
My goals for the next week are pretty simple. My first goal is to continue to work on the back of this quilt. My goal is to get five rows completely sewn together, and combine four rows into one section. My stretch goal is to get all six rows that are laid out sewn together, and lay out the last two rows.
Wow, the bottom half of the back is almost all layed out. There are two more rows, which I hope to get laid out by the end of this weekend. Whoops, I'm getting a little ahead of myself. I was able to get seven rows sewn together, plus the middle is completely pieced, and the new few rows are all sewn together, waiting to come together with the next section to become bigger. (I just found a mistake in row 25, I hope to fix it tomorrow)
My goals for the next week are pretty simple. My first goal is to continue to work on the back of this quilt. My goal is to get five rows completely sewn together, and combine four rows into one section. My stretch goal is to get all six rows that are laid out sewn together, and lay out the last two rows.
My second goal, which will continue to be a goal until it is completely done, is to work on unpacking our house. Our goal for the week is to clean the kitchen, and work on the box that is driving my husband insane, which is in front of his bookcase. My stretch goal is to work on the goodwill/garage sale boxes as it is quickly approaching!
I hope everyone has a great week!
Sharing at:
-Christina
Wednesday, October 9, 2019
15 Minutes of Stitching - Week 39 & 40 2019
Let us see how the last two weeks went on the stitching front.
Days spent stitching in the week: 12 out of 14
Days spent stitching in September: 25 out of 30
Days spent stitching in October: 6 out of 6
Days spent stitching in 2019: 267 out of 279
Success Rate: 95.7%
My week runs from Monday to Sunday.
These past 2 weeks had a few nights where I just ran out of time and choose sleep over 15 minutes. That is okay, because sleep is really good for me. I am still well above my goal of 90% for the year, and even above 95%. I hope to finish the year off strong and find time for every day for the last quarter of the year. Do you think I can do it? I'm six for six already.
Week 39
This week, some went out, more than I expected, but a lot came in. I hope to not buy fabric, unless to finish a project during the last quarter of the year. My new goal is to have only a gain of 325 yards for the year. I think that is doable between with what came in during Week 40, and the few quilts I plan to finish by the end of the year. Here is to adjusting our goals as needed.
Fabric out this week: 1.20 yards
Fabric out, in 2019: 45.23 yards
Fabric in this week: 38.27 yards
Fabric in, in 2019: 381.12 yards
Fabric difference in 2019: 335.89 gain of yards
Week 40
This week, no fabric went out as I am putting together blocks with no sashing or extra fabric. That is okay, as the next few weeks very little will go out as I work on the back. I did receive almost the last of the fabric orders that I made at the end of September. The fabric in amount will decrease dramatically over the next few weeks and then be at almost 0 for the rest of the year. That is my goal, along with only having a gain of 325-350 yards. Which I will be able to achieve if I am able to finish a quilt or two or make serious progress on a few. My goals include finishing a few quilts before the end of the year.
Fabric out this week: 0 yards
Fabric out, in 2019: 45.23 yards
Fabric in this week: 27.29 yards
Fabric in, in 2019: 408.41 yards
Fabric difference in 2019: 363.18 gain of yards
I hope everyone had a great week!
Sharing at:
Life in Pieces
-Christina
Monday, October 7, 2019
October 2019 One Monthly Goal
My goal for the month is to finish the bottom half of the backing. There are twenty-eight rows for the entire backing. My goal is to have fourteen of them completed by the end of October. I have started to lay it out, and have about two rows done, which is not done in this picture.
My stretch goal for the month is to get 21 rows put together, so I am about three fourths done. I would love to get it fully done, but there will be a lot of days that I am able to get just 15 minutes in this month.
Progress is better than nothing. Maybe a finish next month?
Sharing at:
Elm Street Quilts
-Christina
Tuesday, October 1, 2019
Design Wall Tuesday
This past week was semi productive. I was able to finish all of the 4-patches I have been working on for the past week, which is a major accomplishment. I was then able to start laying out the back and writing on the blocks.
My goals for the next week are pretty simple. My first goal is to work on the back of Rev. Craig's quilt. I plan to sew two rows together for the back, and finish putting on the borders for the top. My stretch goal is to get another two rows sewn together.
My second goal, which will continue to be a goal until it is completely done, is to work on unpacking our house. Our goal for the week is to clean the kitchen, set up the patio, and work on the living room. My stretch goal is to work on the garage sale/goodwill pile, and keep sifting dirt from our front yard.
I hope everyone has a great week!
Sharing at:
-Christina
Monday, September 30, 2019
September 2019 One Monthly Goal Completed!!!
This month, my goals included to finish the last of the stitch and flip blocks, which are now completed.
Then I wanted to sew all of the matched pairs for 4-patches that I had cut and ready to go. So this pile....
turned into this.
I even was able to start on my stretch goal of laying out the back, which feels awesome to get a little ahead.
Now to think of what I will do for October. I should get on that!
Sharing at:
Elm Street Quilts
-Christina
Wednesday, September 25, 2019
15 Minutes of Stitching - Week 38 2019
Let us see how the last two weeks went on the stitching front.
Days spent stitching in the week: 6 out of 7
Days spent stitching in September: 19 out of 22
Days spent stitching in 2019: 255 out of 265
Success Rate: 96.2%
My week runs from Monday to Sunday.
I missed one day as I was just exhausted after coming home one night and went straight to bed. That is okay, sometimes my body just needs it right now. My success rate is still above what my goal is for the year so I feel great. Here is to a new week that I will spend every day finding time to stitch.
Fabric came in! I have a few big purchases coming in, in the next few weeks, and then I am cut off! Hopefully I can whittle it down below 300 yards in, but we will see what the end of the year brings. At least my fabric out each week has been pretty large, but it is going to slow down as I sew together the backing, where all of the fabric has already been counted as out. That is okay, as it will feel great to get this quilt closer to completion!
Fabric out this week: 2.86 yards
Fabric out, in 2019: 44.03 yards
Fabric in this week: 15.48 yards
Fabric in, in 2019: 342.85 yards
Fabric difference in 2019: 298.82 gain of yards
I hope everyone had a great week!
Sharing at:
Life in Pieces
-Christina
Monday, September 23, 2019
Design Wall Monday
Yes! I am doing this on Monday! Happy day. This past week has been busy, but still productive in my sewing corner. I was able to finish over 100 4-patches this week, 142 to be exact. It feels great to have that many done.
I was also able to iron the side borders for the quilt top, and then measure for the top and bottom borders. All three measurements I took matched each other. I was so proud of myself when I measured, I was smiling ear to ear for a little while.
I was also able to iron the side borders for the quilt top, and then measure for the top and bottom borders. All three measurements I took matched each other. I was so proud of myself when I measured, I was smiling ear to ear for a little while.
My goals for the next week are below. My first goal is to work on the back of Rev. Craig's quilt. I would like to complete the rest of the 4-patches, cut, pin, and sew on the top and bottom borders, and work on trimming up the 1/2 square triangles I have created thanks to the bonus triangle method. My stretch goal is to start to layout the back and write on the blocks that need to be written on.
My second goal, which will continue to be a goal until it is completely done, is to work on unpacking our house. Our goal for the week is to clean the kitchen, set up the patio, and work on the living room. My stretch goal is to work on the garage sale/goodwill pile, and keep sifting dirt from our front yard.
I hope everyone has a great week!
Sharing at:
-Christina
Wednesday, September 18, 2019
15 Minutes of Stitching - Week 37 2019
Let us see how the last two weeks went on the stitching front.
Days spent stitching in the week: 7 out of 7
Days spent stitching in September: 13 out of 15
Days spent stitching in 2019: 249 out of 258
Success Rate: 96.5%
My week runs from Monday to Sunday.
This week went much better with finding time to stitch. It has felt great to find time, and see the progress that is being made on the quilt I am working on. I can get 50 4-patches sewn in about a 15 minute time frame. With the holidays quickly approaching I hope to find time and continue to work towards finishing a few projects before the season starts.
No fabric in!!! That is a huge cause for celebration right now. I am less than 9 yards to having over 50 yards out for the year, which feels amazing! My goal is to keep my fabric difference under a gain of 300 yards this year. Next year I hope my gain will be much closer to 0, especially since I have a feeling my sewing time is going to decrease dramatically within the next year.
Fabric out this week: 2.39 yards
Fabric out, in 2019: 41.17 yards
Fabric in this week: 0.00 yards
Fabric in, in 2019: 327.37 yards
Fabric difference in 2019: 286.20 gain of yards
I hope everyone had a great week!
Sharing at:
Life in Pieces
-Christina
Tuesday, September 17, 2019
Design Wall Tuesday
The last two weeks have flown by, but I have gotten some sewing done! I finished all of the stitch and flip blocks, all 276 blocks. Now I have started to sew together the 4-patches that are all cut and just need to be run through the machine.
I am making progress on my September One Monthly Goal by finishing the stitch and flip blocks and working on the 4-patchs. Once I finish the 4-patches I will be able to start on my stretch goal, which I might get some serious work done on this month!
I am making progress on my September One Monthly Goal by finishing the stitch and flip blocks and working on the 4-patchs. Once I finish the 4-patches I will be able to start on my stretch goal, which I might get some serious work done on this month!
My goals for the next week are below. My first goal is to work on the back of Rev. Craig's quilt. I would like to complete 100 4-patches, finish the side borders on the front and cut and pin the top and bottom borders. My stretch goal is to finish another 50 4-patches, and finish the borders on the quilt top.
My second goal, which will continue to be a goal until it is completely done, is to work on unpacking our house. Our goal for the week is to clean the kitchen, set up the patio, and work on the garage sale/goodwill pile. My stretch goal is to work on unpacking the living room, and keep sifting dirt from our front yard.
I hope everyone has a great week!
Sharing at:
-Christina
Wednesday, September 11, 2019
15 Minutes of Stitching - Week 35 & 36 2019
Let us see how the last two weeks went on the stitching front.
Days spent stitching in the week: 11 out of 14
Days spent stitching in August: 30 out of 31
Days spent stitching in September: 6 out of 8
Days spent stitching in 2019: 248 out of 258
Success Rate: 96.1%
My week runs from Monday to Sunday.
I missed a few days in the last two weeks, I was either reading or we got home late and I just wanted to fall into bed as I was that tired. We had some hot days plus humidity, which is not normal for our area, and it completely wiped me. As I have gotten older I have noticed that the heat just beats me down. Next week I am off to a great start so far, so hopefully I can bring my numbers up just a little more before the end of the year. I'm extremely happy that I am still above 95% for the year!
Fabric in/out for Week 35:
More fabric went out then in this week! That is a major cause for celebration! It feels great to have been able to accomplish this feat. I do know next week it will not be the same, but that is okay. I am buying for two new projects that need to get done soon. Sew one seam at a time.
Fabric out this week: 1.39 yards
Fabric out, in 2019: 38.78 yards
Fabric in this week: 1.17 yards
Fabric in, in 2019: 312.09 yards
Fabric difference in 2019: 273.31 gain of yards
Fabric in/out for Week 36:
I did not iron anything this past week, even though I finished a lot. It will count towards next week, which is okay. We went to the quilt shop and I found some end of bolt pieces that will be great for two baby quilts I need to make in the next few months. I hope to raid my stash for the rest, if not I will be visiting again sooner than later. I might need to change the difference by the end of the year from under 250 to under 300, but we will see how the rest of the year goes.
Fabric out this week: 0.00 yards
Fabric out, in 2019: 38.78 yards
Fabric in this week: 15.28 yards
Fabric in, in 2019: 327.37 yards
Fabric difference in 2019: 288.59 gain of yards
I hope everyone had a great week!
Sharing at:
Life in Pieces
-Christina
Saturday, September 7, 2019
September 2019 OMG
For the month of September, I am returning to working on a Retirement Quilt for the Pastor at our church. I have gathered signatures, pieces blocks together, put together the top, and cut out the pieces for the back.
My goal for the month is to get the last of the stitch and flip corner blocks finished. I believe there are only about 70 blocks left.
Then I want to sew all of the 4 patches together that are matched and cut ready for sewing.
My stretch goal is to get the center laid out, start sewing it together, and square up all of the bonus triangles I have made.
I hope everyone has a successful month, and is able to accomplish your goals for the month.
Sharing at:
Elm Street Quilts
-Christina
Monday, September 2, 2019
Design Wall Monday
I have been productive during the last week, but no where near the weekend before. I just didn't have time for a sew day. But that is okay. I was able to meet my goals. I finished over 50 stitch and flip corner blocks, 61 to be exact.
It feels great to move this project along, and I have a feeling that this will become my September One Monthly Goal.
It feels great to move this project along, and I have a feeling that this will become my September One Monthly Goal.
My goals for the next week are below. I plan to focus on the stitch and flip corner blocks for the back of Rev. Craig's retirement quilt. My goal is to finish at least 40 of the stitch and flip corner blocks. My stretch goal is to finish them all, I only have about 60, but they all need to be started from scratch. I also plan to spend a little bit of time trimming up the bonus triangles that have been created.
My second goal, which will continue to be a goal until it is completely done, is to work on unpacking our house. Our goal for the week is to set up the patio, and work on the garage sale/goodwill pile. My stretch goal is to finish going through the garage sale/goodwill pile, and working on unpacking the living room.
I hope everyone has a great week!
Sharing at:
-Christina
Saturday, August 31, 2019
August 2019 OMG Completed!
I finally finished a One Monthly Goal before the end of the month! I am so excited. You can find my goal listed here.
Vintage Rose saw a lot of progress this past month. I was able to finish part B very early in the month, which is below.
Then I finished part D in class this last weekend, as I needed help with the top part.
During the weekend I also finished the last part of my goal, which was to start on the next section, which is part C. I am a little over 25% done with this section, and if I can find some solid time sewing I could get it done pretty quickly. Paper piecing is easy, especially when you have a steady rhythm down and you stick to it.
Now that I am done for the month, I need to think about what I can finish in the month of September. I do have to take into consideration, I do not have as much sewing time in the month as I have had in August.
Sharing at:
-Christina
Wednesday, August 28, 2019
15 Minutes of Stitching - Week 34 2019
Let us see how the last week went on the stitching front.
Days spent stitching in the week: 7 out of 7
Days spent stitching in August: 25 out of 25
Days spent stitching in 2019: 231 out of 237
Success Rate: 97.5%
My week runs from Monday to Sunday.
My success rate is creeping back up, and it feels great. I love finding time each day, as it is relaxing and centers me after a long day at work, or weekend housekeeping. It helps that I had several sew days this past week, but they were so worth it.
This past week I still acquired some fabric, one large chunk for a backing for a quilt, and they were having a sale. How could I say no? I have to use just under 25 more yards of fabric to meet my yearly goal of only having a difference of 250 yards in my stash. As long as I do not buy too much more, I think I will be able to manage my goal. There is another sale this week...we will see if I can resist temptation.
Fabric out this week: 1.89 yards
Fabric out, in 2019: 37.39 yards
Fabric in this week: 29.25 yards
Fabric in, in 2019: 310.92 yards
Fabric difference in 2019: 273.53 gain of yards
I hope everyone had a great week!
Sharing at:
Life in Pieces
-Christina
Tuesday, August 27, 2019
Design Wall Tuesday
This past week, I did not get to all of my goals, but I got a large chunk of them done. I had a Judy Niemeyer paper piecing class with a certified instructor. She is scheduled at the shop about once a year, so you have to come with questions or areas you need help on. I did, and I got what I wanted done. I got section D done, the top part is what I needed help with.
Then I started on the next section, and got about 28% of the way done with it. This quilt is slowly coming together, and I can not wait to get it finished!
In addition to some of the quilting goals being met, I was able to finish finding furniture and placing it in the house, and went through the estate stuff from my Grandmother that arrived on Monday.
My goals for the next week are below. I plan to focus on the stitch and flip corner blocks for the back of Rev. Craig's retirement quilt. My goal is to finish 50 of the stitch and flip corner blocks, but my stretch goal is to get them all done. If I get them all done this week, I want to start focusing on trimming the bonus triangles I am getting from these blocks.
Then I started on the next section, and got about 28% of the way done with it. This quilt is slowly coming together, and I can not wait to get it finished!
In addition to some of the quilting goals being met, I was able to finish finding furniture and placing it in the house, and went through the estate stuff from my Grandmother that arrived on Monday.
My goals for the next week are below. I plan to focus on the stitch and flip corner blocks for the back of Rev. Craig's retirement quilt. My goal is to finish 50 of the stitch and flip corner blocks, but my stretch goal is to get them all done. If I get them all done this week, I want to start focusing on trimming the bonus triangles I am getting from these blocks.
My second goal, which will continue to be a goal until it is completely done, is to work on unpacking our house. Our goal for the week is to set up the patio, and work on the garage sale/goodwill pile. My stretch goal is to finish going through the garage sale/goodwill pile, and go through two drawers on the dresser I need to clean out.
I hope everyone has a great week!
Sharing at:
-Christina
Wednesday, August 21, 2019
15 Minutes of Stitching - Week 33 of 2019
Let us see how the last week went on the stitching front.
Days spent stitching in the week: 7 out of 7
Days spent stitching in August: 18 out of 18
Days spent stitching in 2019: 224 out of 230
Success Rate: 97.4%
My week runs from Monday to Sunday.
This week had two planned sew days, which made it easy to find time to stitch. I love seeing progress made on my projects, and this week I definitely moved a few along. Thank you to Kate for encouraging us to do just 15 minutes a day, as it makes a difference in my progress.
This past week I still acquired some fabric, but it has decreased significantly. I was given some fabric from the ladies at my sew group to use in some quilts I am currently working on. My goal is still to get under 250 yards gained for the year. Next year, I hope to have no gain, as I think my sewing time will decrease dramatically towards the end of the year.
Fabric out this week: 1.89 yards
Fabric out, in 2019: 35.50 yards
Fabric in this week: 8.75 yards
Fabric in, in 2019: 281.67 yards
Fabric difference in 2019: 246.17 gain of yards
I hope everyone had a great week!
Sharing at:
Life in Pieces
-Christina
Tuesday, August 20, 2019
Design Wall Tuesday
This last week has been good. I was able to achieve all of my goals! I pieced the backing and put the zippers on my Mom's Christmas gift in preparation for quilting. I also was able to complete 39 of the stitch and flip corner blocks, which was above my goal for the week! I also actually sat down and pinned the borders onto the quilt top that has been waiting for them for far too long.
The last thing I worked on and was able to accomplish was getting halfway done with Section D-2 for Vintage Rose. I was able to get over halfway done, which feels great!
In addition to all of the quilting goals being met, I was able to finish building the garage shelves and putting things on them, and cleaned up a few outstanding boxes. The living room is being put together this week, and I am loving how it is turning out.
My goals for the next week are to focus on two things. My first goal is work on Vintage Rose by finishing Section D-2, and D-3 plus sew D-1, D-2, and D-3 together into one unit. I would like to start working on another section, and get the necessary help on a different section as I have class this upcoming weekend. My stretch goal is to get halfway done with the other section I plan to start this weekend.
My second goal is to work on the stitch and flip corner blocks for the back of Rev. Craig's retirement quilt. My goal is to finish 20 of the stitch and flip corner blocks, and my stretch goal is to finish 40 blocks. There is only about 100 left to complete.
The last thing I worked on and was able to accomplish was getting halfway done with Section D-2 for Vintage Rose. I was able to get over halfway done, which feels great!
In addition to all of the quilting goals being met, I was able to finish building the garage shelves and putting things on them, and cleaned up a few outstanding boxes. The living room is being put together this week, and I am loving how it is turning out.
My goals for the next week are to focus on two things. My first goal is work on Vintage Rose by finishing Section D-2, and D-3 plus sew D-1, D-2, and D-3 together into one unit. I would like to start working on another section, and get the necessary help on a different section as I have class this upcoming weekend. My stretch goal is to get halfway done with the other section I plan to start this weekend.
My second goal is to work on the stitch and flip corner blocks for the back of Rev. Craig's retirement quilt. My goal is to finish 20 of the stitch and flip corner blocks, and my stretch goal is to finish 40 blocks. There is only about 100 left to complete.
My third goal, which will continue to be a goal until it is completely done, is to work on unpacking our house. Our goal for the week is to focus on placing furniture/finding furniture to finish the living room, set up the patio, and work on some (2-3) boxes in the garage. My stretch goal is to finish going through the garage sale/goodwill pile, and go through a total of 6 boxes in the garage.
I hope everyone has a great week!
Sharing at:
-Christina
Wednesday, August 14, 2019
15 Minutes of Stitching - Week 32 2019
Let us see how the last week went on the stitching front.
Days spent stitching in the week: 7 out of 7
Days spent stitching in August: 11 out of 11
Days spent stitching in 2019: 217 out of 223
Success Rate: 97.3%
My week runs from Monday to Sunday.
This week was very easy to find time to stitch. I'm excited to be working on the projects I'm currently working on, and I am loving seeing the progress coming along. My scraps are slowly being processed, and I'm excited to finish another project so I can get more processed!
This past week with fabric, I moved a little less than last week out, but I acquired a lot. As a result my gain is now over 250 yards for the year, and my goal for the year is to get it below 225. I have a little more fabric coming over the next few weeks, but I am cutting myself off. If I need a fabric fix, all I need to do is go into my sewing room and look at all that is there, or go into the garage where I have shelves filled with future projects and fabrics to go through. I need to make a goal for next year to not buy any, unless it is to finish a project. The hardest part right now is going through my currently disorganized stash to find fabric for a co-worker's baby quilt. It is just easier to buy new, but I am going to stick to it, and make something work from my current stash.
Fabric out this week: 0.90 yards
Fabric out, in 2019: 33.61 yards
Fabric in this week: 56.20 yards
Fabric in, in 2019: 272.92 yards
Fabric difference in 2019: 239.31 gain of yards
I hope everyone had a great week!
Sharing at:
Life in Pieces
-Christina
Tuesday, August 13, 2019
Design Wall Tuesday
This last week has been productive! I worked on Vintage Rose, where I finished cutting all of the pieces for D1 and D2.
Then I sewed together D1, it is ready for trimming and the TRP lines. I can not remember what order I normally do them in so, I am waiting for class next week to finish these all of the way.
I was also very productive in trimming up scraps. I figured out the organization that I wanted, and I'm looking forward to continuing to plug away at this project, and put things away. Pictures will come next week.
In addition to all of the quilting goals being met, I was able to work on the garage shelves, which are almost all done. When the whole garage is basically organized I will share a picture. I will admit, it is a little overwhelming the amount of quilting and crafty stuff I have. I guess I really need to watch my numbers of fabric in and fabric out for the rest of the year, and many years in the future!
My goals for the next week are to focus on three things. My first goal is to get halfway done with section D2 on Vintage Rose. This section has 29 pieces and 28 seams, so I would like to complete 14 seams. My stretch goal is to finish the whole section.
My second goal is to work on pinning the borders on Craig's retirement quilt, and stitch and flip corner blocks for the back of the quilt. My goal is to finish 25 of the stitch and flip corner blocks, and my stretch goal is to finish 50 blocks. There is only about 135 left to complete.
My third goal is to prepare the backing to my Mom's Christmas gift, and put the zippers on the front and back. I hope to quilt this in the month of September, but first I need to finish the other quilt I plan to quilt at the same time.
Then I sewed together D1, it is ready for trimming and the TRP lines. I can not remember what order I normally do them in so, I am waiting for class next week to finish these all of the way.
I was also very productive in trimming up scraps. I figured out the organization that I wanted, and I'm looking forward to continuing to plug away at this project, and put things away. Pictures will come next week.
In addition to all of the quilting goals being met, I was able to work on the garage shelves, which are almost all done. When the whole garage is basically organized I will share a picture. I will admit, it is a little overwhelming the amount of quilting and crafty stuff I have. I guess I really need to watch my numbers of fabric in and fabric out for the rest of the year, and many years in the future!
My goals for the next week are to focus on three things. My first goal is to get halfway done with section D2 on Vintage Rose. This section has 29 pieces and 28 seams, so I would like to complete 14 seams. My stretch goal is to finish the whole section.
My second goal is to work on pinning the borders on Craig's retirement quilt, and stitch and flip corner blocks for the back of the quilt. My goal is to finish 25 of the stitch and flip corner blocks, and my stretch goal is to finish 50 blocks. There is only about 135 left to complete.
My third goal is to prepare the backing to my Mom's Christmas gift, and put the zippers on the front and back. I hope to quilt this in the month of September, but first I need to finish the other quilt I plan to quilt at the same time.
My fourth goal, which will continue to be a goal until it is completely done, is to work on unpacking our house. Our goal for the week is to focus on sorting the get rid of a pile. Is it going to our own garage sale, or Goodwill? Prepare our guest room for guests this weekend, and continue working on the garage, I would like to finish building the shelves, and loading them up. My stretch goals are to clean off the patio and build our new furniture and start to hanging pictures.
I hope everyone has a great week!
Sharing at:
-Christina
Subscribe to:
Posts (Atom)





























