Monday, April 1, 2019

Design Wall Monday

The past two weeks have been a ton of fun!  I'm still in shock with everything that has happened a little.  First off I took two classes with Bonnie Hunter!  I thoroughly enjoyed myself.  I also got my picture with her because of what my shirt says!


I was able to get two full blocks done, and they look great!  These blocks are for a quilt called Sandcastles found in her brand new book.


The second class I took what Box Kites, which comes from another of her books.


I loved every moment of her classes, plus I got to quilt!  Who could complain?  Then half way through Box Kites, my husband sent a text, call me ASAP...I thought something was wrong as they were driving back to my in-law's house.  He then told me he won one of the grand prizes!!!!  How awesome is that!  Of course he does not quilt so he is "donating" it to me.  He has requested a quilt out of some of the fabrics, which is so hard to do... ;)

 

Since we got home I was able to finish my March OMG, however I ran out of time to post before the deadline.  It is okay, I will get it this month.

     

Now that we are back from vacation, it is time to get back into my projects.  The first thing is to decide on what my April One Monthly Goal will be.  I have a few options, I just have to narrow it down and pick one.

My second goal is to work on and finish Unit C for the Daisy Chain Mystery QAL.  I am having fun, and basically keeping up with the clues.


My third goal is to work on my niece's birthday present or start to work towards my April One Monthly Goal.

My fourth and final goal, which will continue to be a goal until I am completely done, is work on unpacking our house.  Our goal for the week is to finish the kitchen, and work on tearing out the front planter box.

I hope everyone has a great week!

Sharing at:
Love Laugh Quilt
Small Quilts and Doll Quilts

-Christina

15 Minutes of Stitching - Week 13 2019

Let us see how this week went on the stitching front.

Days spent stitching this week: 7 out of 7
Days spent stitching in March: 31 out of 31
Days spent stitching in 2019: 87 out of 90
Success Rate: 96.7%
My week runs from Monday to Sunday.

The hardest day to find time to stitch was the day we returned home from vacation.  It turned into a long travel day, and a few hiccups happened when we got home.  Every other day was a piece of cake to find time to stitch.  I am finding more time this year, which I am very proud of, and this is the first month that I have not missed a day of stitching.  If I keep this up I will be well on my way to exceeding my 15 minutes of stitching goal.

In the early part of the week I went to a quilt shop while on vacation.  I found some wonderful sale fabrics, and when I was getting ready to get everything cut, I found the new Winnie the Pooh fabrics, where they are out in the woods.  They are darling, so I had to get some of that to add to the other Winnie the Pooh fabrics I have in my stash.  This was the last purchase I made, and it will be the last for some time.  I will have to buy time on the long arm, but no fabric will be coming home then.  I have some serious yardage to use up, as I want to loose some this year.

Fabric out this week: .39 yards
Fabric out, in 2019: 14.97 yards
Fabric in this week: 5.5 yards
Fabric in, in 2019: 91.66 yards
Fabric difference in 2019: gain of 76.69 yards

I hope everyone had a great week!

Sharing at:
Life in Pieces

-Christina

Wednesday, March 27, 2019

15 Minutes of Stitching - Week 12 2019

Let us see how this week went on the stitching front.

Days spent stitching this week: 7 out of 7
Days spent stitching in March: 24 out of 24
Days spent stitching in 2019: 80 out of 83
Success Rate: 96.4%
My week runs from Monday to Sunday.

This week went really well in finding time to stitch.  Of course it helped I had a project ready to work on while I was on vacation, which was diligently worked on.  I love seeing progress, and it amazes me how much you can do in just 15 minutes of time when you put your mind to it!

This past week I went to a quilt show....of course there was serious stash enhancement, then my husband won one of the grand prizes for me, as I'm the lucky one who gets all of the goodies!  This of course increases my fabric in considerably, more than I originally bought.  Because I'm out of town, I did not get a lot actually sewing done, just what I completed in class.  Next week I will have more out than in, as I believe I am on a no buying restriction, for the most part.  It is going to take most of the year before I am back to more out than in. (opps)

Fabric out this week: .48 yards
Fabric out, in 2019: 14.58 yards
Fabric in this week: 59.92 yards
Fabric in, in 2019: 86.16 yards
Fabric difference in 2019: gain of 71.58 yards

I hope everyone had a great week!

Sharing at:
Life in Pieces

-Christina

Tuesday, March 19, 2019

15 Minutes of Stitching - Week 11 2019

Let us see how this week went on the stitching front.

Days spent stitching this week: 7 out of 7
Days spent stitching in March: 17 out of 17
Days spent stitching in 2019: 73 out of 76
Success Rate: 96.1%
My week runs from Monday to Sunday.

This past week was easy to find stitching.  I was preparing for classes at Pigeon Forge Mountain Quiltfest!  I had some major ironing and cutting to do before flying back east.  After a long travel day, and loss of 3 hours, I was still able to find time to do 15 minutes during the 11th hour, while just talking and hanging out with family.  My house might have been left a mess, but it was all worth it because I am really proud of my success rate!

My fabric usage was bigger than I thought it would be this past week.  This was due to ironing a lot.  It is amazing when you iron stuff, how much you can rack up.  I ironed a lot of things I've been sewing, but have not count until after it was ironed.  I still have a gain, and it will increase this next week as I'm going to a vendor fair during the quilt show I am attending.  I have a plan as to what I want to buy, but you never know what else will hop into my bags.

Fabric out this week: 2.60 yards
Fabric out, in 2019: 14.10 yards
Fabric in this week: 0 yards
Fabric in, in 2019: 26.21 yards
Fabric difference in 2019: gain of 12.11 yards

I hope everyone had a great week!

Sharing at:
Life in Pieces

-Christina

Design Wall Tuesday

This past week I have been pretty productive!  I finished Unit A and Unit B, for the Daisy Chain Mystery QAL.  All 4 patches, a set that is scrappy and the other set with a focal fabric and scrappy background.  I can not wait to see how it comes together!

   

I finished prepping for the two classes I will be taking later this week.  The first I will be taking is Sandcastles, and then Box Kite.  I am all prepared and ready to go, except to pack my class bags, but that is okay, I still have time.

        

I also have started making progress on my niece's ISpy quilt.  I have a lot of paper piecing to do, but it will be fun, and I am going to eat the whole elephant one bite at a time.  A lot of prep work, and some sewing is my March One Monthly Goal.


This week will be semi easy, as I am on vacation!  The first goal is to do some cutting and prep work to work towards my March One Monthly Goal.

My second goal is to have fun and enjoy the two classes will be taking later this week at Mountain Quiltfest in Pigeon Forge!

My third goal, if I have time, is start to cut for Idaho Square Dance quilt by Bonnie Hunter.  I will not be in the class this week, but I brought everything to make it, so I can work on cutting it out, and at the same time work on cutting out Blue Ridge and Jamestown Landing from the blue scraps I will be creating.

Sharing at:
Love Laugh Quilt
Small Quilts and Doll Quilts
Main Crush Mondays

-Christina

Unit B - Daisy Chain Mystery QAL


This week we made more 4 patches, which means there is still plenty of time to start and catch up to where we are!


These four patches were fun to make being scrappy and mismatching.  The hardest part was making sure I did not have repeat fabrics within the same block.

If you are interested in joining, please do!  Hop on over to here, and you can check it out.  There are a variety of sizes for the quilt given.  I am being ambitious by doing a queen, but so far it has been pretty easy to keep up with.

-Christina

Wednesday, March 13, 2019

Wednesday WIP


What am I working on?  Lots of things.

1. Daisy Chain Mystery QAL - Step one is almost done.  I just have to iron my units!


2. Prepping for 3, (yes THREE), classes next week.  One class I am on the waitlist for, and the other two I am in.  Everything is almost cut, ready to go.  I just need to pack it all up come Friday, and hope I do not forget anything.

                            

3. Putting a black border on Scrappy Bargello to prevent seams from coming undone during travel and show and tell.


Well, three things are not necessary lots of things, but it feels like a lot.  Each step moves an item closer to completion.

Sharing at:

-Christina

15 Minutes of Stitching - Week 10 2019

Let us see how this week went on the stitching front.

Days spent stitching this week: 7 out of 7
Days spent stitching in March: 10 out of 10
Days spent stitching in 2019: 66 out of 69
Success Rate: 95.7%
My week runs from Monday to Sunday.

It was easy to find time this week.  I have a lot going on, preparing for Pigeon Forge Mountain Quiltfest, and keeping up with the Daisy Chain Mystery QAL.  There will always be something to keep me busy, as long as I do my 15 minutes before I lay down for bedtime.  I hope to see some finishes next month!

My fabric usage slowed down considerably!  There was none.  It was all cutting/prepping and some sewing, but no units were "finished", which is when I am counting the units completed.  That is okay, next week should be a little better, and the week after even better.  At least nothing came in!

Fabric out this week: 0 yards
Fabric out, in 2019: 11.50 yards
Fabric in this week: 0 yards
Fabric in, in 2019: 26.21 yards
Fabric difference in 2019: gain of 14.71 yards

I hope everyone had a great week!

Sharing at:
Life in Pieces

-Christina

Wednesday, March 6, 2019

March 2019 One Monthly Goal


This month I had to think of a project that would be easy to transport, and makes progress on something I need to get done this year.  My mind went to the ISpy quilt I want to make for my niece. She is turning 5 this year, and I want to finish this quilt for her birthday.  I have until August, but the year is already flying by!


My goal for the month is to finish cutting the backing blocks, as the backing is going to be pieced, sew the first set of triangles on 50 of the blocks, trim and prepare the other 126 blocks for the first set of triangles.  A stretch goal is to finish cutting out the pink and purple triangles for the third square, prep the second set of triangles for the second square for the first 50 blocks already completed, and start sewing the last 126 blocks to start.  That is a lot, but each piece is small, building something larger.  I better get to work!

Sharing at:
Elm Street Quilts

-Christina

Tuesday, March 5, 2019

Daisy Chain Mystery QAL Unit A


Are you joining us for the Daisy Chain Mystery QAL at Little Bunny Quilts?  I hope you are.  This week directions for Unit A were released.  What were Unit A???  4 patches!  A great way to start off a mystery.


I am going really scrappy, 16 done 80 to go for the queen.  I'll be working on finishing them up this week.  Two weeks until directions for Unit B are posted.  There is still plenty of time to pick you fabrics, cut them out and start before then.  It is offered in baby to queen sizes.

-Christina

Design Wall Tuesday

For some reasons Mondays fly by each week, and I run out of time to do a Design Wall Post.  Oh well, it is Tuesday again!  This past week I went on a shop hop with my Mom through the San Diego County quilt shops.  We had a ton of fun, and of course I acquired many goodies.  I did buy with intention this year, unlike previous years.  I started collecting for a quilt, and picked up some additional pieces for a class I will be attending later this month.  Below is my fabric haul, and the kits for each block with the free pattern we got for going to each store.

 

I also made progress on putting together some quilt blocks.  They have turned out pretty great, and next month I will continue putting them together.  I also finished my February OMG, as it was to get this far.


My goals for this week are:
1. Prepping for classes that I will be taking in a few weeks with Bonnie Hunter.  I need to make sure I have everything together and ready to go by next Saturday!  I have a lot to do before then. (insert chicken running around without a clue)

2. Get 3/4's of the way done with knitting the baby blanket for a co-worker.  The rows are getting shorter and I'm noticing how quicker each one is going.  I am close to 3/4's just not there yet, hopefully this week?

3. Finish Unit A for the Daisy Chain Mystery Quilt Along.  Are you are joining us?  It is free!


4.  Continue to unpack and organize my house.  We made some great headway on things this past weekend, but we still have a lot to do!  It is a work in progress, and I have figured out how I'm going to store my fabric, and how we are going to utilize an extra closet and make it more storage friendly! I feel like there will always be a project around our house to do, and it all costs money, so it takes time.  It is a work in progress!


I hope everyone has a productive and great week!
Sharing at:

-Christina

15 Minutes of Stitching - Week 9 2019

Let us see how this week went on the stitching front.

Days spent stitching this week: 7 out of 7
Days spent stitching in February: 26 out of 28
Days spent stitching in March: 3 out of 3
Days spent stitching in 2019: 59 out of 62
Success Rate: 95.2%
My week runs from Monday to Sunday.

I am going to continue to rave about having your own space.  It is amazing to me because I want to stitch more, even though I'm tired and I still have my 15 minutes to do at the end of the day, it is so easy to walk in there and pick up where I left off.  Sometimes I take five minutes and set up what I'm going to work on the next day, so I know exactly what I planned to do.  Before I had my own space sometimes it was hard to be motivated, especially when it is half an hour before bed, and to bring out my cutting stuff or the ironing board as that is the next step.  It is AMAZING! Progress is being made on many different projects, and I'm getting better and accomplishing my goals each month.

My fabric usage slowed down, which is what I expected as I worked on putting together some blocks, using very little additional fabric.  I also started working on my niece's ISpy quilt, which helped boast the numbers just a little.  However, I went on a shop hop, and only bought with intention, but I still bought a lot, especially when I need to be using my stash.  Everything I bought will be used in a quilt I am slowly buying for, and for a class that I will be participating in soon just to add a little more variety.  As long as by the end of the year I have used more than I acquired I will find that as a win!

Fabric out this week: .54 yards
Fabric out, in 2019: 11.50 yards
Fabric in this week: 21.21 yards
Fabric in, in 2019: 26.21 yards
Fabric difference in 2019: gain of 14.71 yards

I hope everyone had a great week!

Sharing at:
Life in Pieces

-Christina

Wednesday, February 27, 2019

February 2019 One Monthly Goal


My February 2019 OMG, was to finish step five, and start step six of the quilt pattern entitled Ring of Stars.  I have enlarged the quilt pattern to fit a queen, instead of a twin, which requires more blocks.  I finished, and actually went above my goal (by three blocks)!  Another plus side, it is not the last day of the month!

Step five was to make 4 patches into more 4 patches.  Completed before the middle of the month.


The first part of step six was to make some sashing, which went off without a hitch.


The second part of step six was to put together the blocks.  My goal was to only put together one full block, but instead of just one, I got four done, and a fifth close to done, but the last seam still needs to be sewn.


It feels great to have my OMG done, and I'm not scrambling to post on the last night of the month!  Now it is time to pick my March OMG.

Sharing at:
Elm Street Quilts

-Christina

Tuesday, February 26, 2019

Design Wall Tuesday

This last week was productive.  Granted not what I totally planned, but sometimes a little clean up and organization is good for the soul.  I finished sewing the sashing pieces together, and then ironed them to start creating blocks for the quilt I am working on.


I also was fed up with some scraps that had been sitting at my cutting table and decided it was time to start cutting them down.  So I did.  I made tumblers, 1.5", 2", and 2.5" squares, and 2.5" by 6" strips for a braided border.  My table is cleaned, and I have my eye on the next stack of scraps I want to work on (I just have to unpack them).


My goals for this week are:
1. Finish my February OMG, which is almost done.  I started to sew a block together, and I just need to finish it to complete my goal.  However my goal for this week is to put together at least 4 blocks.


2. Get 3/4's of the way done with knitting the baby blanket for a co-worker.  The rows are getting shorter and I'm noticing how quicker each one is going.  I am close to 3/4's just not there yet, hopefully this week.

3. Finish cutting my fabric pieces for the Daisy Chain Mystery Quilt Along and be ready for the first clue, which will be released next week.  I hope you are joining us.


4.  Continue to unpack and organize my house.  This past week we had our first set of real guests, and it was nice to host people, but it is back to unpacking and organizing.  It is taking a lot longer than expected, but I'm confident that we are putting things in the right spots so we do not have to worry about them moving forward.

5. I am 90% sure I will be doing the San Diego County shop hop with my Mom this weekend.  I do not plan to buy anything except for the block kits.  I know how I want to finish it and I have all of the fabrics already.  Fingers crossed I stick to this plan as I do not need ANYTHING!  Plus I need to save to repair our main sewer line, which needs to be repaired by the summer.  The theme this year is Notions.

I hope everyone has a productive and great week!
Sharing at:

-Christina

15 Minutes of Stitching - Week 8 2019

Let us see how this week went on the stitching front.

Days spent stitching this week: 6 out of 7
Days spent stitching in February: 22 out of 24
Days spent stitching in 2019: 52 out of 55
Success Rate: 94.5%
My week runs from Monday to Sunday.

This last week went pretty well, granted I missed one day.  It was Saturday and I hung out with friends until the wee hours of the morning.  At least it was for me, so when they left I went straight to bed.  It is amazing to see the progress that I am making on projects this year.  I think it also helps I have a designated space now.  No true finishes yet, but I am getting close to a few.  Hopefully in the next quarter I will have some finishes!

My fabric usage will be the last big number for a little while, as I will be putting together some blocks over the next week.  That is okay though as I'm putting together a quilt top, and it has been a long time coming!  I can not wait.

Fabric out this week: 1.56 yards
Fabric out, in 2019: 10.96 yards
Fabric in this week: 0 yards
Fabric in, in 2019: 5 yards
Fabric difference in 2019: loss of 5.96 yards

I hope everyone had a great week!

Sharing at:
Life in Pieces

-Christina

Tuesday, February 19, 2019

Daisy Chain Mystery QAL Fabric Cutting


 
It is here!  Time to start cutting our fabrics for the Daisy Chain Mystery QAL.  The cutting directions can be found at Little Bunny Quilts.  Alison has done a fantastic job at laying out exactly what you need for each quilt size (in a wonderful table), and each cut type is labeled with a letter for organization.


Here are my fabrics cut.  I have these awesome little letters from Cora's Quilts, but you can also find them at Fat Quarter Shop or other places.  I use them to help me stay organized, so I do not have to keep remeasuring to figure out which size each one is.  I'm excited to see how our cut pieces come together.

It is never too late to join the Daisy Chain Mystery QAL, hop on over to Little Bunny Quilts, and under the Daisy Chain Mystery QAL tab Alison has everything laid out for any visitor.

Piecing of Unit Block A starts in two weeks.  Will you be ready?

-Christina

Monday, February 18, 2019

Design Wall Monday

Yes!  I made it on a Monday!  Small victories, even though I missed last week's.  What have I been working on these last two weeks?  Well there has been a decent chunk I believe.  I have used almost 5 yards of fabric in the last two weeks, which I think is amazing!  I have finished the border on this quilt.  Next step is quilting, but that won't be until April I believe.


I was able to complete the 6th and final panel on this quilt, but I do not have a picture of it yet.  Next is a black border and then the braided border.  I have to see if I have any black fabric starched.  I thought I did, but it is going to be a hunt.


I also finished my Breakfast Club homework!!!  Early too.  I worked on step 5, putting the 4 patches into more 4 patches.  They turned out well.  I am halfway done with my February OMG, which feels awesome!


My goals for this week are:
1. Continue working on my February OMG, which step 5 is completed, now to start step 6.  I want to get the sashing completed this week, and start laying out the blocks that will be put together.  I can not wait to see these come together!


2. Get 3/4's of the way done with knitting the baby blanket for a co-worker.  She is delivering tomorrow, so I missed giving it to her before baby came, but when she comes to visit in about a month, I hope I can have it done and ready for her by then.

3. Finish starching fabric for the Daisy Chain Mystery Quilt Along (it has not been drying very well as it is so cold here).  Finish cutting and be ready for the first clue.  I hope you are joining us.  I will be posting my cut fabric tomorrow, so come back to see it.


4.  Continue to unpack and prep my house.  We have our first official guests over, that are not family, but like family coming this weekend!  I would love to organize and put away some of my sewing area, but we will see what happens, as it is a busy week, and I just hurt myself today.  It is going to be an interesting week indeed.

I hope everyone has a productive and great week!
Sharing at:


-Christina

15 Minutes of Stitching - Week 6 and 7 2019

Let us see how this week went on the stitching front.

Days spent stitching this week: 14 out of 14
Days spent stitching in February: 16 out of 17
Days spent stitching in 2019: 46 out of 48
Success Rate: 95.8%
My week runs from Monday to Sunday.

I ran out of time to post last weeks numbers, so I just rolled it into this week.  I have been finding time to stitch every day and it is showing.  I am trying to be more organized, and know what I plan to work on.  I normally work for about 30 minutes or more if I have the time.  I hope a few things get done this year, and I'm excited to see things progressing.

My fabric usage is going very well!  In the upcoming weeks, fabric usage will slow down as I will be putting together blocks, but that is okay.  Progress is being made on my projects and I could not be happier.

Fabric out this week: 4.17 yards
Fabric out, in 2019: 9.40 yards
Fabric in this week: 0 yards
Fabric in, in 2019: 5 yards
Fabric difference in 2019: loss of 4.4 yards

I hope everyone had a great week!

Sharing at:
Life in Pieces

-Christina

Tuesday, February 5, 2019

February 2019 One Monthly Goal


For this month, my goal is to make progress on a wedding quilt.  I want to finish step 5, which is make a bigger 4 patch out of small four patches and squares, and start step 6, which is sewing sashing together, and start on block construction.


This might be too much for me to get done, but even if I start making 1 of the 12 blocks by the end of the month, I will feel accomplished!  Good luck to everyone on their goals, I hope February continues to be a productive month!

Sharing at:
Elm Street Quilts

-Christina

Design Wall Tuesday

This last week I was able to finish panel #5, and I did start panel #6, but that will be finished at a later date.


I am loving how this is coming together.

I was able to pick out my fabrics for the Daisy Chain Mystery QAL, and you can find the blog post about it here.  I can not wait to see how this comes together.

I picked out my February OMG, which I will be posting about later tonight.

I did pretty well with my goals considering how sick I was last week.  (Sinus infection after a cold)
My goals for this week are:
1. Start on my February OMG, which is to make progress on a wedding quilt.  I hope to get the four patches sewn to squares this week.  Maybe, even start sewing the four patches into bigger four patches after ironing.


2. Get 3/4's of the way done with knitting the baby blanket for a co-worker.  I made some progress last week by getting to the halfway mark.  Now it is just the downhill slope.

3. Starch fabric for the Daisy Chain Mystery Quilt Along.  Cutting will be here before I know it, and I want to be prepared.


4.  Organize my sewing area, I need to sanitize the drawers for the units I will be using, and start putting tools into them, plus using the storage ideas I have bought already.  I will also be able to set up the closet with my plastic tubs of fabric, so that will nice to start getting organized.  Maybe even move in a bookcase I plan to use.  We will see what I have time for!

I hope everyone is having a great week!
Sharing at:

-Christina

Monday, February 4, 2019

Daisy Chain Mystery QAL Fabric Choices


If you have not heard about the Daisy Chain Mystery Quilt Along, it is okay, you are hearing about it now!  It is a free mystery quilt along hosted by Honey, Bunny and Doll Quilts over at Little Bunny Quilts.  Every two weeks for the next few months we will get a clue on how a new pattern will go together.  Just hop on over, and you can pick your fabrics based on the four different sizes that will be presented!

I am sharing my fabric choices.  I am aiming to make the queen, but realistically I will be able to create the throw during the quilt along.


My fabric choices are above.  The red and yellow floral print is my focal fabric.  My accent are the blues on the right as they accent my focal fabric pretty well.  The backgrounds I'm using are the cream/white scrappy fabrics.  The assorted scraps I have chosen are the purple, grey and brown fabrics.  I'm excited to see how this turns out.  I hope you will join us and follow along.

-Christina

15 Minutes of Stitching - Week 5 2019

Let us see how this week went on the stitching front.

Days spent stitching this week: 6 out of 7
Day spent stitching in January: 30 out of 31
Days spent stitching in February: 2 out of 3
Days spent stitching in 2019: 32 out of 34
Success Rate: 94.2%
My week runs from Monday to Sunday.

I found time to stitch as it was my get away this past week while being sick.  However being sick and loosing my mojo caught up to me on Saturday.  I have changed projects and have found my mojo a little, but my hope is to find more of my mojo this next weekend.  To do this I want to work on my sewing area (after more of the house comes together) to get a little organized and unpack some of my quilting boxes, so hopefully I will have a little more normalcy/what I want at my finger tips again.  I think not having this, this last week really brought me down.

My fabric usage is still consistent, which is nice.  In the next few weeks I want to start experimenting with the fabric I have bought so that will be used soon too!  (I'm just excited I have not bought any fabric just because or for a new project that was not on the docket this year!)

Fabric out this week:1.11 yards
Fabric out, in 2019: 5.23 yards
Fabric in this week: 0 yards
Fabric in, in 2019: 5 yards
Fabric difference in 2019: loss of .23 yards

I hope everyone had a great week!

Sharing at:
Life in Pieces

-Christina