Let us see how this week went on the stitching front.
Days spent stitching this week: 7 out of 7
Days spent stitching in March: 10 out of 10
Days spent stitching in 2019: 66 out of 69
Success Rate: 95.7%
My week runs from Monday to Sunday.
It was easy to find time this week. I have a lot going on, preparing for Pigeon Forge Mountain Quiltfest, and keeping up with the Daisy Chain Mystery QAL. There will always be something to keep me busy, as long as I do my 15 minutes before I lay down for bedtime. I hope to see some finishes next month!
My fabric usage slowed down considerably! There was none. It was all cutting/prepping and some sewing, but no units were "finished", which is when I am counting the units completed. That is okay, next week should be a little better, and the week after even better. At least nothing came in!
Fabric out this week: 0 yards
Fabric out, in 2019: 11.50 yards
Fabric in this week: 0 yards
Fabric in, in 2019: 26.21 yards
Fabric difference in 2019: gain of 14.71 yards
I hope everyone had a great week!
Sharing at:
Life in Pieces
-Christina
Wednesday, March 13, 2019
Wednesday, March 6, 2019
March 2019 One Monthly Goal
This month I had to think of a project that would be easy to transport, and makes progress on something I need to get done this year. My mind went to the ISpy quilt I want to make for my niece. She is turning 5 this year, and I want to finish this quilt for her birthday. I have until August, but the year is already flying by!
My goal for the month is to finish cutting the backing blocks, as the backing is going to be pieced, sew the first set of triangles on 50 of the blocks, trim and prepare the other 126 blocks for the first set of triangles. A stretch goal is to finish cutting out the pink and purple triangles for the third square, prep the second set of triangles for the second square for the first 50 blocks already completed, and start sewing the last 126 blocks to start. That is a lot, but each piece is small, building something larger. I better get to work!
Sharing at:
Elm Street Quilts
-Christina
Tuesday, March 5, 2019
Daisy Chain Mystery QAL Unit A
Are you joining us for the Daisy Chain Mystery QAL at Little Bunny Quilts? I hope you are. This week directions for Unit A were released. What were Unit A??? 4 patches! A great way to start off a mystery.
I am going really scrappy, 16 done 80 to go for the queen. I'll be working on finishing them up this week. Two weeks until directions for Unit B are posted. There is still plenty of time to pick you fabrics, cut them out and start before then. It is offered in baby to queen sizes.
-Christina
Design Wall Tuesday
For some reasons Mondays fly by each week, and I run out of time to do a Design Wall Post. Oh well, it is Tuesday again! This past week I went on a shop hop with my Mom through the San Diego County quilt shops. We had a ton of fun, and of course I acquired many goodies. I did buy with intention this year, unlike previous years. I started collecting for a quilt, and picked up some additional pieces for a class I will be attending later this month. Below is my fabric haul, and the kits for each block with the free pattern we got for going to each store.
I also made progress on putting together some quilt blocks. They have turned out pretty great, and next month I will continue putting them together. I also finished my February OMG, as it was to get this far.
My goals for this week are:
1. Prepping for classes that I will be taking in a few weeks with Bonnie Hunter. I need to make sure I have everything together and ready to go by next Saturday! I have a lot to do before then. (insert chicken running around without a clue)
2. Get 3/4's of the way done with knitting the baby blanket for a co-worker. The rows are getting shorter and I'm noticing how quicker each one is going. I am close to 3/4's just not there yet, hopefully this week?
3. Finish Unit A for the Daisy Chain Mystery Quilt Along. Are you are joining us? It is free!
4. Continue to unpack and organize my house. We made some great headway on things this past weekend, but we still have a lot to do! It is a work in progress, and I have figured out how I'm going to store my fabric, and how we are going to utilize an extra closet and make it more storage friendly! I feel like there will always be a project around our house to do, and it all costs money, so it takes time. It is a work in progress!
I also made progress on putting together some quilt blocks. They have turned out pretty great, and next month I will continue putting them together. I also finished my February OMG, as it was to get this far.
My goals for this week are:
1. Prepping for classes that I will be taking in a few weeks with Bonnie Hunter. I need to make sure I have everything together and ready to go by next Saturday! I have a lot to do before then. (insert chicken running around without a clue)
2. Get 3/4's of the way done with knitting the baby blanket for a co-worker. The rows are getting shorter and I'm noticing how quicker each one is going. I am close to 3/4's just not there yet, hopefully this week?
3. Finish Unit A for the Daisy Chain Mystery Quilt Along. Are you are joining us? It is free!
4. Continue to unpack and organize my house. We made some great headway on things this past weekend, but we still have a lot to do! It is a work in progress, and I have figured out how I'm going to store my fabric, and how we are going to utilize an extra closet and make it more storage friendly! I feel like there will always be a project around our house to do, and it all costs money, so it takes time. It is a work in progress!
I hope everyone has a productive and great week!
Sharing at:
-Christina
15 Minutes of Stitching - Week 9 2019
Let us see how this week went on the stitching front.
Days spent stitching this week: 7 out of 7
Days spent stitching in February: 26 out of 28
Days spent stitching in March: 3 out of 3
Days spent stitching in 2019: 59 out of 62
Success Rate: 95.2%
My week runs from Monday to Sunday.
I am going to continue to rave about having your own space. It is amazing to me because I want to stitch more, even though I'm tired and I still have my 15 minutes to do at the end of the day, it is so easy to walk in there and pick up where I left off. Sometimes I take five minutes and set up what I'm going to work on the next day, so I know exactly what I planned to do. Before I had my own space sometimes it was hard to be motivated, especially when it is half an hour before bed, and to bring out my cutting stuff or the ironing board as that is the next step. It is AMAZING! Progress is being made on many different projects, and I'm getting better and accomplishing my goals each month.
My fabric usage slowed down, which is what I expected as I worked on putting together some blocks, using very little additional fabric. I also started working on my niece's ISpy quilt, which helped boast the numbers just a little. However, I went on a shop hop, and only bought with intention, but I still bought a lot, especially when I need to be using my stash. Everything I bought will be used in a quilt I am slowly buying for, and for a class that I will be participating in soon just to add a little more variety. As long as by the end of the year I have used more than I acquired I will find that as a win!
Fabric out this week: .54 yards
Fabric out, in 2019: 11.50 yards
Fabric in this week: 21.21 yards
Fabric in, in 2019: 26.21 yards
Fabric difference in 2019: gain of 14.71 yards
I hope everyone had a great week!
Sharing at:
Life in Pieces
-Christina
Days spent stitching this week: 7 out of 7
Days spent stitching in February: 26 out of 28
Days spent stitching in March: 3 out of 3
Days spent stitching in 2019: 59 out of 62
Success Rate: 95.2%
My week runs from Monday to Sunday.
I am going to continue to rave about having your own space. It is amazing to me because I want to stitch more, even though I'm tired and I still have my 15 minutes to do at the end of the day, it is so easy to walk in there and pick up where I left off. Sometimes I take five minutes and set up what I'm going to work on the next day, so I know exactly what I planned to do. Before I had my own space sometimes it was hard to be motivated, especially when it is half an hour before bed, and to bring out my cutting stuff or the ironing board as that is the next step. It is AMAZING! Progress is being made on many different projects, and I'm getting better and accomplishing my goals each month.
My fabric usage slowed down, which is what I expected as I worked on putting together some blocks, using very little additional fabric. I also started working on my niece's ISpy quilt, which helped boast the numbers just a little. However, I went on a shop hop, and only bought with intention, but I still bought a lot, especially when I need to be using my stash. Everything I bought will be used in a quilt I am slowly buying for, and for a class that I will be participating in soon just to add a little more variety. As long as by the end of the year I have used more than I acquired I will find that as a win!
Fabric out this week: .54 yards
Fabric out, in 2019: 11.50 yards
Fabric in this week: 21.21 yards
Fabric in, in 2019: 26.21 yards
Fabric difference in 2019: gain of 14.71 yards
I hope everyone had a great week!
Sharing at:
Life in Pieces
-Christina
Wednesday, February 27, 2019
February 2019 One Monthly Goal
My February 2019 OMG, was to finish step five, and start step six of the quilt pattern entitled Ring of Stars. I have enlarged the quilt pattern to fit a queen, instead of a twin, which requires more blocks. I finished, and actually went above my goal (by three blocks)! Another plus side, it is not the last day of the month!
Step five was to make 4 patches into more 4 patches. Completed before the middle of the month.
The first part of step six was to make some sashing, which went off without a hitch.
The second part of step six was to put together the blocks. My goal was to only put together one full block, but instead of just one, I got four done, and a fifth close to done, but the last seam still needs to be sewn.
It feels great to have my OMG done, and I'm not scrambling to post on the last night of the month! Now it is time to pick my March OMG.
Sharing at:
Elm Street Quilts
-Christina
Tuesday, February 26, 2019
Design Wall Tuesday
This last week was productive. Granted not what I totally planned, but sometimes a little clean up and organization is good for the soul. I finished sewing the sashing pieces together, and then ironed them to start creating blocks for the quilt I am working on.
I also was fed up with some scraps that had been sitting at my cutting table and decided it was time to start cutting them down. So I did. I made tumblers, 1.5", 2", and 2.5" squares, and 2.5" by 6" strips for a braided border. My table is cleaned, and I have my eye on the next stack of scraps I want to work on (I just have to unpack them).
My goals for this week are:
1. Finish my February OMG, which is almost done. I started to sew a block together, and I just need to finish it to complete my goal. However my goal for this week is to put together at least 4 blocks.
2. Get 3/4's of the way done with knitting the baby blanket for a co-worker. The rows are getting shorter and I'm noticing how quicker each one is going. I am close to 3/4's just not there yet, hopefully this week.
3. Finish cutting my fabric pieces for the Daisy Chain Mystery Quilt Along and be ready for the first clue, which will be released next week. I hope you are joining us.
4. Continue to unpack and organize my house. This past week we had our first set of real guests, and it was nice to host people, but it is back to unpacking and organizing. It is taking a lot longer than expected, but I'm confident that we are putting things in the right spots so we do not have to worry about them moving forward.
5. I am 90% sure I will be doing the San Diego County shop hop with my Mom this weekend. I do not plan to buy anything except for the block kits. I know how I want to finish it and I have all of the fabrics already. Fingers crossed I stick to this plan as I do not need ANYTHING! Plus I need to save to repair our main sewer line, which needs to be repaired by the summer. The theme this year is Notions.
I also was fed up with some scraps that had been sitting at my cutting table and decided it was time to start cutting them down. So I did. I made tumblers, 1.5", 2", and 2.5" squares, and 2.5" by 6" strips for a braided border. My table is cleaned, and I have my eye on the next stack of scraps I want to work on (I just have to unpack them).
My goals for this week are:
1. Finish my February OMG, which is almost done. I started to sew a block together, and I just need to finish it to complete my goal. However my goal for this week is to put together at least 4 blocks.
2. Get 3/4's of the way done with knitting the baby blanket for a co-worker. The rows are getting shorter and I'm noticing how quicker each one is going. I am close to 3/4's just not there yet, hopefully this week.
3. Finish cutting my fabric pieces for the Daisy Chain Mystery Quilt Along and be ready for the first clue, which will be released next week. I hope you are joining us.
4. Continue to unpack and organize my house. This past week we had our first set of real guests, and it was nice to host people, but it is back to unpacking and organizing. It is taking a lot longer than expected, but I'm confident that we are putting things in the right spots so we do not have to worry about them moving forward.
5. I am 90% sure I will be doing the San Diego County shop hop with my Mom this weekend. I do not plan to buy anything except for the block kits. I know how I want to finish it and I have all of the fabrics already. Fingers crossed I stick to this plan as I do not need ANYTHING! Plus I need to save to repair our main sewer line, which needs to be repaired by the summer. The theme this year is Notions.
I hope everyone has a productive and great week!
Sharing at:
-Christina
15 Minutes of Stitching - Week 8 2019
Let us see how this week went on the stitching front.
Days spent stitching this week: 6 out of 7
Days spent stitching in February: 22 out of 24
Days spent stitching in 2019: 52 out of 55
Success Rate: 94.5%
My week runs from Monday to Sunday.
This last week went pretty well, granted I missed one day. It was Saturday and I hung out with friends until the wee hours of the morning. At least it was for me, so when they left I went straight to bed. It is amazing to see the progress that I am making on projects this year. I think it also helps I have a designated space now. No true finishes yet, but I am getting close to a few. Hopefully in the next quarter I will have some finishes!
My fabric usage will be the last big number for a little while, as I will be putting together some blocks over the next week. That is okay though as I'm putting together a quilt top, and it has been a long time coming! I can not wait.
Fabric out this week: 1.56 yards
Fabric out, in 2019: 10.96 yards
Fabric in this week: 0 yards
Fabric in, in 2019: 5 yards
Fabric difference in 2019: loss of 5.96 yards
I hope everyone had a great week!
Sharing at:
Life in Pieces
-Christina
Days spent stitching this week: 6 out of 7
Days spent stitching in February: 22 out of 24
Days spent stitching in 2019: 52 out of 55
Success Rate: 94.5%
My week runs from Monday to Sunday.
This last week went pretty well, granted I missed one day. It was Saturday and I hung out with friends until the wee hours of the morning. At least it was for me, so when they left I went straight to bed. It is amazing to see the progress that I am making on projects this year. I think it also helps I have a designated space now. No true finishes yet, but I am getting close to a few. Hopefully in the next quarter I will have some finishes!
My fabric usage will be the last big number for a little while, as I will be putting together some blocks over the next week. That is okay though as I'm putting together a quilt top, and it has been a long time coming! I can not wait.
Fabric out this week: 1.56 yards
Fabric out, in 2019: 10.96 yards
Fabric in this week: 0 yards
Fabric in, in 2019: 5 yards
Fabric difference in 2019: loss of 5.96 yards
I hope everyone had a great week!
Sharing at:
Life in Pieces
-Christina
Tuesday, February 19, 2019
Daisy Chain Mystery QAL Fabric Cutting
It is here! Time to start cutting our fabrics for the Daisy Chain Mystery QAL. The cutting directions can be found at Little Bunny Quilts. Alison has done a fantastic job at laying out exactly what you need for each quilt size (in a wonderful table), and each cut type is labeled with a letter for organization.
Here are my fabrics cut. I have these awesome little letters from Cora's Quilts, but you can also find them at Fat Quarter Shop or other places. I use them to help me stay organized, so I do not have to keep remeasuring to figure out which size each one is. I'm excited to see how our cut pieces come together.
It is never too late to join the Daisy Chain Mystery QAL, hop on over to Little Bunny Quilts, and under the Daisy Chain Mystery QAL tab Alison has everything laid out for any visitor.
Piecing of Unit Block A starts in two weeks. Will you be ready?
-Christina
Monday, February 18, 2019
Design Wall Monday
Yes! I made it on a Monday! Small victories, even though I missed last week's. What have I been working on these last two weeks? Well there has been a decent chunk I believe. I have used almost 5 yards of fabric in the last two weeks, which I think is amazing! I have finished the border on this quilt. Next step is quilting, but that won't be until April I believe.
I was able to complete the 6th and final panel on this quilt, but I do not have a picture of it yet. Next is a black border and then the braided border. I have to see if I have any black fabric starched. I thought I did, but it is going to be a hunt.
I also finished my Breakfast Club homework!!! Early too. I worked on step 5, putting the 4 patches into more 4 patches. They turned out well. I am halfway done with my February OMG, which feels awesome!
My goals for this week are:
1. Continue working on my February OMG, which step 5 is completed, now to start step 6. I want to get the sashing completed this week, and start laying out the blocks that will be put together. I can not wait to see these come together!
2. Get 3/4's of the way done with knitting the baby blanket for a co-worker. She is delivering tomorrow, so I missed giving it to her before baby came, but when she comes to visit in about a month, I hope I can have it done and ready for her by then.
3. Finish starching fabric for the Daisy Chain Mystery Quilt Along (it has not been drying very well as it is so cold here). Finish cutting and be ready for the first clue. I hope you are joining us. I will be posting my cut fabric tomorrow, so come back to see it.
4. Continue to unpack and prep my house. We have our first official guests over, that are not family, but like family coming this weekend! I would love to organize and put away some of my sewing area, but we will see what happens, as it is a busy week, and I just hurt myself today. It is going to be an interesting week indeed.
I was able to complete the 6th and final panel on this quilt, but I do not have a picture of it yet. Next is a black border and then the braided border. I have to see if I have any black fabric starched. I thought I did, but it is going to be a hunt.
I also finished my Breakfast Club homework!!! Early too. I worked on step 5, putting the 4 patches into more 4 patches. They turned out well. I am halfway done with my February OMG, which feels awesome!
My goals for this week are:
1. Continue working on my February OMG, which step 5 is completed, now to start step 6. I want to get the sashing completed this week, and start laying out the blocks that will be put together. I can not wait to see these come together!
2. Get 3/4's of the way done with knitting the baby blanket for a co-worker. She is delivering tomorrow, so I missed giving it to her before baby came, but when she comes to visit in about a month, I hope I can have it done and ready for her by then.
3. Finish starching fabric for the Daisy Chain Mystery Quilt Along (it has not been drying very well as it is so cold here). Finish cutting and be ready for the first clue. I hope you are joining us. I will be posting my cut fabric tomorrow, so come back to see it.
4. Continue to unpack and prep my house. We have our first official guests over, that are not family, but like family coming this weekend! I would love to organize and put away some of my sewing area, but we will see what happens, as it is a busy week, and I just hurt myself today. It is going to be an interesting week indeed.
I hope everyone has a productive and great week!
Sharing at:
-Christina
15 Minutes of Stitching - Week 6 and 7 2019
Let us see how this week went on the stitching front.
Days spent stitching this week: 14 out of 14
Days spent stitching in February: 16 out of 17
Days spent stitching in 2019: 46 out of 48
Success Rate: 95.8%
My week runs from Monday to Sunday.
I ran out of time to post last weeks numbers, so I just rolled it into this week. I have been finding time to stitch every day and it is showing. I am trying to be more organized, and know what I plan to work on. I normally work for about 30 minutes or more if I have the time. I hope a few things get done this year, and I'm excited to see things progressing.
My fabric usage is going very well! In the upcoming weeks, fabric usage will slow down as I will be putting together blocks, but that is okay. Progress is being made on my projects and I could not be happier.
Fabric out this week: 4.17 yards
Fabric out, in 2019: 9.40 yards
Fabric in this week: 0 yards
Fabric in, in 2019: 5 yards
Fabric difference in 2019: loss of 4.4 yards
I hope everyone had a great week!
Sharing at:
Life in Pieces
-Christina
Days spent stitching this week: 14 out of 14
Days spent stitching in February: 16 out of 17
Days spent stitching in 2019: 46 out of 48
Success Rate: 95.8%
My week runs from Monday to Sunday.
I ran out of time to post last weeks numbers, so I just rolled it into this week. I have been finding time to stitch every day and it is showing. I am trying to be more organized, and know what I plan to work on. I normally work for about 30 minutes or more if I have the time. I hope a few things get done this year, and I'm excited to see things progressing.
My fabric usage is going very well! In the upcoming weeks, fabric usage will slow down as I will be putting together blocks, but that is okay. Progress is being made on my projects and I could not be happier.
Fabric out this week: 4.17 yards
Fabric out, in 2019: 9.40 yards
Fabric in this week: 0 yards
Fabric in, in 2019: 5 yards
Fabric difference in 2019: loss of 4.4 yards
I hope everyone had a great week!
Sharing at:
Life in Pieces
-Christina
Tuesday, February 5, 2019
February 2019 One Monthly Goal
For this month, my goal is to make progress on a wedding quilt. I want to finish step 5, which is make a bigger 4 patch out of small four patches and squares, and start step 6, which is sewing sashing together, and start on block construction.
This might be too much for me to get done, but even if I start making 1 of the 12 blocks by the end of the month, I will feel accomplished! Good luck to everyone on their goals, I hope February continues to be a productive month!
Sharing at:
Elm Street Quilts
-Christina
Design Wall Tuesday
This last week I was able to finish panel #5, and I did start panel #6, but that will be finished at a later date.
I am loving how this is coming together.
I was able to pick out my fabrics for the Daisy Chain Mystery QAL, and you can find the blog post about it here. I can not wait to see how this comes together.
I picked out my February OMG, which I will be posting about later tonight.
I did pretty well with my goals considering how sick I was last week. (Sinus infection after a cold)
My goals for this week are:
1. Start on my February OMG, which is to make progress on a wedding quilt. I hope to get the four patches sewn to squares this week. Maybe, even start sewing the four patches into bigger four patches after ironing.
2. Get 3/4's of the way done with knitting the baby blanket for a co-worker. I made some progress last week by getting to the halfway mark. Now it is just the downhill slope.
3. Starch fabric for the Daisy Chain Mystery Quilt Along. Cutting will be here before I know it, and I want to be prepared.
4. Organize my sewing area, I need to sanitize the drawers for the units I will be using, and start putting tools into them, plus using the storage ideas I have bought already. I will also be able to set up the closet with my plastic tubs of fabric, so that will nice to start getting organized. Maybe even move in a bookcase I plan to use. We will see what I have time for!
I am loving how this is coming together.
I was able to pick out my fabrics for the Daisy Chain Mystery QAL, and you can find the blog post about it here. I can not wait to see how this comes together.
I picked out my February OMG, which I will be posting about later tonight.
I did pretty well with my goals considering how sick I was last week. (Sinus infection after a cold)
My goals for this week are:
1. Start on my February OMG, which is to make progress on a wedding quilt. I hope to get the four patches sewn to squares this week. Maybe, even start sewing the four patches into bigger four patches after ironing.
2. Get 3/4's of the way done with knitting the baby blanket for a co-worker. I made some progress last week by getting to the halfway mark. Now it is just the downhill slope.
3. Starch fabric for the Daisy Chain Mystery Quilt Along. Cutting will be here before I know it, and I want to be prepared.
4. Organize my sewing area, I need to sanitize the drawers for the units I will be using, and start putting tools into them, plus using the storage ideas I have bought already. I will also be able to set up the closet with my plastic tubs of fabric, so that will nice to start getting organized. Maybe even move in a bookcase I plan to use. We will see what I have time for!
I hope everyone is having a great week!
Sharing at:
-Christina
Monday, February 4, 2019
Daisy Chain Mystery QAL Fabric Choices
If you have not heard about the Daisy Chain Mystery Quilt Along, it is okay, you are hearing about it now! It is a free mystery quilt along hosted by Honey, Bunny and Doll Quilts over at Little Bunny Quilts. Every two weeks for the next few months we will get a clue on how a new pattern will go together. Just hop on over, and you can pick your fabrics based on the four different sizes that will be presented!
I am sharing my fabric choices. I am aiming to make the queen, but realistically I will be able to create the throw during the quilt along.
My fabric choices are above. The red and yellow floral print is my focal fabric. My accent are the blues on the right as they accent my focal fabric pretty well. The backgrounds I'm using are the cream/white scrappy fabrics. The assorted scraps I have chosen are the purple, grey and brown fabrics. I'm excited to see how this turns out. I hope you will join us and follow along.
-Christina
15 Minutes of Stitching - Week 5 2019
Let us see how this week went on the stitching front.
Days spent stitching this week: 6 out of 7
Day spent stitching in January: 30 out of 31
Days spent stitching in February: 2 out of 3
Days spent stitching in 2019: 32 out of 34
Success Rate: 94.2%
My week runs from Monday to Sunday.
I found time to stitch as it was my get away this past week while being sick. However being sick and loosing my mojo caught up to me on Saturday. I have changed projects and have found my mojo a little, but my hope is to find more of my mojo this next weekend. To do this I want to work on my sewing area (after more of the house comes together) to get a little organized and unpack some of my quilting boxes, so hopefully I will have a little more normalcy/what I want at my finger tips again. I think not having this, this last week really brought me down.
My fabric usage is still consistent, which is nice. In the next few weeks I want to start experimenting with the fabric I have bought so that will be used soon too! (I'm just excited I have not bought any fabric just because or for a new project that was not on the docket this year!)
Fabric out this week:1.11 yards
Fabric out, in 2019: 5.23 yards
Fabric in this week: 0 yards
Fabric in, in 2019: 5 yards
Fabric difference in 2019: loss of .23 yards
I hope everyone had a great week!
Sharing at:
Life in Pieces
-Christina
Days spent stitching this week: 6 out of 7
Day spent stitching in January: 30 out of 31
Days spent stitching in February: 2 out of 3
Days spent stitching in 2019: 32 out of 34
Success Rate: 94.2%
My week runs from Monday to Sunday.
I found time to stitch as it was my get away this past week while being sick. However being sick and loosing my mojo caught up to me on Saturday. I have changed projects and have found my mojo a little, but my hope is to find more of my mojo this next weekend. To do this I want to work on my sewing area (after more of the house comes together) to get a little organized and unpack some of my quilting boxes, so hopefully I will have a little more normalcy/what I want at my finger tips again. I think not having this, this last week really brought me down.
My fabric usage is still consistent, which is nice. In the next few weeks I want to start experimenting with the fabric I have bought so that will be used soon too! (I'm just excited I have not bought any fabric just because or for a new project that was not on the docket this year!)
Fabric out this week:1.11 yards
Fabric out, in 2019: 5.23 yards
Fabric in this week: 0 yards
Fabric in, in 2019: 5 yards
Fabric difference in 2019: loss of .23 yards
I hope everyone had a great week!
Sharing at:
Life in Pieces
-Christina
Thursday, January 31, 2019
January 2019 One Monthly Goal Finished
Well I finished my January One Monthly Goal in the knick of time tonight. I was able to complete four panels during January, which makes a total of five. I will be doing a sixth panel to make it just a little larger, but that can come later.
I am really excited I got this done! Now to think of what my February OMG will be. I hope everyone had a successful month!
Linking up with:
Elm Street Quilts
-Christina
Tuesday, January 29, 2019
Design Wall Tuesday
This past week I was able to work towards my goals, which included making panel #4 for my Scrappy Bargello Quilt, pattern by Bonnie Hunter at Quiltville. I started on panel #5, but it has not been finished yet. Can I get this quilt top done before the end of the month? It is quickly approaching, and I think I will get at least 5 of my 6 panels done.
Over the weekend I also made progress on the baby blanket, I'm almost halfway done with it. The baby shower was today (opps, they changed the date on me), so it will be gifted once completed.
My goals for this week are:
1. Finish panel #5, and start panel #6 on my Scrappy Bargello Quilt, and start to work on the braided border I plan to do.
2. Get 3/4's of the way done with knitting the baby blanket for a co-worker. I would love to finish it, but I am trying to be realistic in my expectations.
3. Pull my fabric for the Daisy Chain Mystery Quilt Along, and prep my blog post to go live next week! This is being hosted by Honey, Bunny and Doll Quilts at Little Bunny Quilts. Once I do this, it will be time to starch fabric in my new set up for the first time. I need to work out the kinks to have a smooth process.
4. Think about what my February OMG is going to be. There are many choices, I just have yet to decide on one. (This can be the toughest decision sometimes, also it is tough to admit the month is over already...)
Over the weekend I also made progress on the baby blanket, I'm almost halfway done with it. The baby shower was today (opps, they changed the date on me), so it will be gifted once completed.
My goals for this week are:
1. Finish panel #5, and start panel #6 on my Scrappy Bargello Quilt, and start to work on the braided border I plan to do.
2. Get 3/4's of the way done with knitting the baby blanket for a co-worker. I would love to finish it, but I am trying to be realistic in my expectations.
3. Pull my fabric for the Daisy Chain Mystery Quilt Along, and prep my blog post to go live next week! This is being hosted by Honey, Bunny and Doll Quilts at Little Bunny Quilts. Once I do this, it will be time to starch fabric in my new set up for the first time. I need to work out the kinks to have a smooth process.
4. Think about what my February OMG is going to be. There are many choices, I just have yet to decide on one. (This can be the toughest decision sometimes, also it is tough to admit the month is over already...)
I hope everyone is having a great week!
Sharing at:
-Christina
15 Minutes of Stitching - Week 4 of 2019
Let us see how this week went on the stitching front.
Days spent stitching this week: 7 out of 7
Day spent stitching in January: 26 out of 27
Days spent stitching in 2019: 26 out of 27
Success Rate: 96.3%
My week runs from Monday to Sunday.
Wow! I found time even with a busy weekend of picking up the last of the furniture needed for our house(!!!), and coming down with a serious cold. I think my sewing corner is definitely helping with that because I want to come over and sew. We installed a light over my corner and it helps light it up and improves my visibility. I also love making progress on the quilt I'm working on.
My fabric usage is still consistent, but I did add for a quilt that I need to start working on. The difference is not bad though, and next week I should have it back to a loss! This is definitely keeping me honest and I'm interested in seeing what will happen over the next few months.
Fabric out this week:1.11 yards
Fabric out, in 2019: 4.12 yards
Fabric in this week: 5 yards
Fabric in, in 2019: 5 yards
Fabric difference in 2019: gain of 0.88 yards
I hope everyone had a great week!
Sharing at:
Life in Pieces
-Christina
Days spent stitching this week: 7 out of 7
Day spent stitching in January: 26 out of 27
Days spent stitching in 2019: 26 out of 27
Success Rate: 96.3%
My week runs from Monday to Sunday.
Wow! I found time even with a busy weekend of picking up the last of the furniture needed for our house(!!!), and coming down with a serious cold. I think my sewing corner is definitely helping with that because I want to come over and sew. We installed a light over my corner and it helps light it up and improves my visibility. I also love making progress on the quilt I'm working on.
My fabric usage is still consistent, but I did add for a quilt that I need to start working on. The difference is not bad though, and next week I should have it back to a loss! This is definitely keeping me honest and I'm interested in seeing what will happen over the next few months.
Fabric out this week:1.11 yards
Fabric out, in 2019: 4.12 yards
Fabric in this week: 5 yards
Fabric in, in 2019: 5 yards
Fabric difference in 2019: gain of 0.88 yards
I hope everyone had a great week!
Sharing at:
Life in Pieces
-Christina
Wednesday, January 23, 2019
15 Minutes of Stitching - Week 3 of 2019
Let us see how the first week of the year went on the stitching front.
Days spent stitching this week: 6 out of 7
Day spent stitching in January: 19 out of 20
Days spent stitching in 2019: 19 out of 20
Success Rate: 95.0%
My week runs from Monday to Sunday.
I am doing great at finding time. Yes, I did miss a day this week, but the day got away from me, running errands and then going to a hockey game in the evening, I was very exhausted from a long day. I am still above 90% so I am very happy, and I hope there are only a few days I miss throughout the year. Only time will tell right now.
My fabric usage went pretty well, even with missing a day. I might be gaining more fabric next week, but it will be bought with a purpose for some quilts I will be making this year, or at least starting.
Fabric out this week:1.90 yards
Fabric out, in 2019: 3.01 yards
Fabric in, in 2019: 0 yards
Fabric difference in 2019: loss of 3.01 yards
I hope everyone had a great week!
Sharing at:
Life in Pieces
-Christina
Days spent stitching this week: 6 out of 7
Day spent stitching in January: 19 out of 20
Days spent stitching in 2019: 19 out of 20
Success Rate: 95.0%
My week runs from Monday to Sunday.
I am doing great at finding time. Yes, I did miss a day this week, but the day got away from me, running errands and then going to a hockey game in the evening, I was very exhausted from a long day. I am still above 90% so I am very happy, and I hope there are only a few days I miss throughout the year. Only time will tell right now.
My fabric usage went pretty well, even with missing a day. I might be gaining more fabric next week, but it will be bought with a purpose for some quilts I will be making this year, or at least starting.
Fabric out this week:1.90 yards
Fabric out, in 2019: 3.01 yards
Fabric in, in 2019: 0 yards
Fabric difference in 2019: loss of 3.01 yards
I hope everyone had a great week!
Sharing at:
Life in Pieces
-Christina
Tuesday, January 22, 2019
Design Wall Tuesday
I have not had a post up for over a month, with good reason to be honest, but wow where did the end of 2018 go, and most of January? Oh that is right, we bought a house!
Then we had to move, and clean our old place, and start the long process of unpacking. Which is still happening, after we lined shelves and cleaned out the dust from getting our wood floors re-done. What a great way end of year, that is for sure.
With a new house comes a sewing corner!!!! This area has been heaven to me, even though it is not fully set up yet (working on the rest of the house with my husband first), it has been amazing. To leave out my project over night and not have to clean it up! What a time saver, and I just want to keep sewing and sewing and sewing.
I have some dates for quilts I want to make this year quickly approaching, so I am going to be focusing on them over the next few months. I am going to participate in the Daisy Chain Mystery Quilt Along by Alison @ Little Bunny Quilts. I will be one of the guest bloggers, and I am excited to be participating. It will encourage me to keep up with the clues as I have to post my progress each time one comes out!
Without further ado, my goals for the week are:
Work on and complete the fourth and fifth panels for the quilt below. It is for Bonnie Hunter's Scrappy Bargello under her free patterns tab on her blog. If you have never seen her quilts, you definitely should. I love her scrappy style.
My second goal for the week is to continue working on a baby blanket for a co-worker. The blanket is being knitted out of the newer chenille yarn that came out on the market in the last few years. It is awesome to work with (at least so far), and the project is going pretty quickly. I have until next Thursday to get it done. I need to get a move on. (I will have a picture next week)
I hope everyone is having a great week!
Sharing at:
-Christina
Subscribe to:
Posts (Atom)
































