Tuesday, April 30, 2019
April 2019 OMG Finished
Yay! I made it, on the last day, but that is okay. My goal for the month can be found here. It was to start making blocks for a signature quilt for the pastor that is retiring from our church at the end of June, plus start to get signatures, and figure out what I planned to do for the front and back.
Here are the blocks that I have finished:
In total I have finished 33 blocks, out of about 145. All of these blocks are already signed, which is great, I just have many more signatures/messages/pictures to collect before the quilt top will be finished.
I was able to also lay out on paper the dimensions, and how I want the back to look at. I still need to figure out totals, but getting a plan down on paper can be the hardest part. (If you have not figured it out, I am a planner to a T! My life has lists, and my husband has learned to live with them)
Now to think of what my May OMG will be. Will I continue on this quilt, or will I work on something else? I will share in a few days!
Sharing at:
Elm Street Quilts
-Christina
Subscribe to:
Post Comments (Atom)
What a lovely idea! Thanks for linking up with Elm Street Quilts One Monthly Goal and congrats on your finish.
ReplyDelete