Wednesday, September 7, 2016

September 2016 OMG

Wow, where has the beginning of September gone already?  I'm sliding this in at the last second it feels like (and is).  In June I had the one monthly goal of cutting the pieces for a wedding quilt, which I finished.

However, the pieces have sat over the summer as I finished up some other projects.  Well these projects are almost done, and I'm going to make some good progress on getting this top done.  My goal for September is to get all of the the Border blocks, and Block A completed, plus start on Block B, and draw the 460 diagonal lines I need to draw for some stitch and flip that will take place in later blocks.  It sounds like a lot, but it should not be too much for me to accomplish.  Maybe I can get even further?  We will see at the end of the month!

Below is a picture of the finished quilt, however I'm going to be making it bigger than this picture to fit a king size bed!  I can not wait to see how it all turns out!


Linking up with Red Letter Quilts for September's OMG.

-Christina



2 comments:

  1. You look very organized! 460 lines doesn't really sound fun, perhaps a movie to go with that chore?

    This will be a fun project to watch, is the background to be black?

    ReplyDelete
    Replies
    1. Thank you, I try to be organized, or else I might get lost in where I am. No, the lines do not, but I will be watching some shows or listening to a podcast while I draw the lines.

      The background is the black. I can not wait to see what how it turns out also.

      Delete

Thank you for your comment, I love to read them and hear from you.